Screw and guide rail is really a more essential area of the plane drilling
machine, therefore, while keeping the plane drilling machine, we're not able to
disregard the upkeep of the screw and rail maintenance work, such as the
following: Plane drilling machine
1, regular inspection, adjust the axial gap
screw nut to guarantee the precision of reverse transmission and axial
stiffness.
2, Regularly check if the link between the screw support and also
the bed is loose and if the supporting bearing is broken fruit
punch vodka. If there's any difficulty above, tighten the loose part over
time and switch the supporting bearing.
3, using grease ball screws, washing
the screw once every six several weeks around the old grease punch
recipes non alcoholic, switch the new grease with lubricating oil ball
screw, each day prior to the machine try to refuel.
4 burton
punch 0140, focus on avoid hard dust or chips in to the screw shield and
work throughout the impact of cover, a safety device to get replaced on time.
No comments:
Post a Comment